In November 2019, the City of Fredericksburg, Texas initiated a Traffic Impact Study (TIS) to be performed by Kimley-Horn. The purpose of the TIS is to determine means to provide local congestion relief. The TIS covers two major components – 1) an evaluation of high-priority new connection projects, and 2) operational and safety improvements at intersections in the City Limits. These connections include:
- Post Oak / Cherry Extension (completes gap from Bowie St to Main St, widens Post Oak)
- Mulberry Extension (connects Mulberry at Llano to Main at Eagle)
- Frederick Rd Extension (SH 16 to US 290 E)
- Inner Loop Extension (formerly Friendship Lane or Interim Relief Route from SH 16 to US 87 N)
This study is independent of the TxDOT Fredericksburg Relief Route Feasibility Study. For more information regarding this study, please visit: https://www.txdot.gov/inside-txdot/projects/studies/austin/fredericksburg-relief-route-study.html
Storyboards from Open House
The storyboards on display at the January 28th Open House can be viewed HERE.
Traffic Impact Study Report - August 2020

Traffic Impact Study Presentation - 2/28/2020